Indian state-run power generation company NTPC said that it will add 4500 MW of capacity in 2016-2017, more than double the 2200 MW added in 2015-2016.
Pakistan’s National Electric Power Regulatory Authority (NEPRA) has said in a report that the country’s power transmission and distribution networks are barely adequate to meet existing requirements, and have little potential to absorb planned generation.