Post - Articles

Wärtsilä wins €292 million order for power supply for US data centres

  • 2 months ago (2026-06-30)
  • David Flin
Gas engine plant 96 North America 1089

Wärtsilä has announced that it has won a €292 million contract to supply engines for a power plant to support data centre developments in the USA. The order was placed by Liberty Energy , based in Denver, Colorado.

World Utilities Congress 2027
More info

World Utilities Congress 2027

The delivery of the equipment to the site is scheduled to begin in 2029 and continue through 2030.

Wärtsilä will supply its 34SG natural gas-powered units, capable of operating in high-temperature environments. Wärtsilä said that these units have low water consumption.

Ron Gusek, CEO of Liberty Energy, said: “AI data centre growth is accelerating demand for next-generation on-site power infrastructure. Wärtsilä’s engine technology will strengthen our integrated power platform, enhancing our ability to deliver reliable, high-efficiency power generation to meet the demanding requirements of advanced computing environments.”