Post - Articles

Flender inaugurates 13.5 MW wind gearbox testing facility in India

  • 6 months ago (2026-03-09)
  • David Flin
Asia 1054 Wind 300

The German company Flender has commissioned India’s largest wind turbine gearbox testing facility near Chennai, Tamil Nadu, India. The 13.5 MW test rig will support large next-generation turbines and strengthen India’s wind turbine manufacturing system.

World Future Energy Summit 2027 (WFES 2027)
More info

World Future Energy Summit 2027 (WFES 2027)

The facility includes India’s largest test rig to validate wind turbine gearboxes. Flender said that the wind industry is in the process of transitioning from mid-scale turbines to large, high-efficiency machines. By expanding the testing capability from 6 MW to 13.5 MW, Flender aims to support the development of next-generation large turbines.

The newly commissioned test rig is designed to simulate extreme mechanical loads and operating conditions.