Xcel Energy has announced the successful completion of the Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Projects, designed to increase the system’s ability to carry wind power to the states of
Huandeng Power International has said that it is trying to raise $1.1 billion through the sale of 800 million Shanghai-traded shares and 400 million Hong Kong-traded shares.
SRI Consulting (SRIC) has released a techno-economic report “Advanced Carbon Capture” that examines the technology and economics of three processes for capturing 90 per cent of the carbon emissions from electric power generation using supercritical pulverised coal.
Mpho Makwana, Eskom’s Acting Chairman, said that the utility was looking for ways to plug the funding gap for its build programme.
Shanghai ,
Areva’s Transmission and Distribution division and the main shareholder of Vamp, the Finnish-based specialist in arc protection and protection relays, announced that they have signed an agreement for Areva T&D to acquire Vamp.