Post - Articles

Pakistan’s Nepra reduces ROE on three nuclear units

  • 3 years ago (2021-02-25)
  • David Flin
Asia 892 Nuclear 659

Pakistan’s National Electric Power Regulatory Authority (Nepra) has reduced the Return On Equity (ROE) of units 2, 3, and 4 of Chashma Nuclear Power Plant. Nepra said that it cut the ROE by $0.0016 per unit, which will result in an annual saving of around $13 million for the remaining life of the units, estimated at 25-37 years. The three units have a net capacity of 931 MW.

E-World 2025
More info

E-World 2025

The Chashma plant is located at Chashman, Tehsil Piplan, Mianwali district in Pakistan, and units 2-4 each have an initial rating of 340 MW.