Post - Articles

GE Hitachi wins long-term outage services contract from Leibstadt nuclear power plant

  • 2 years ago (2021-08-02)
  • David Flin
Europe 1061 Nuclear 639

The Leibstadt Nuclear Power Plant (operated by KKL ) in Switzerland has awarded a long-term contract extension to GE Hitachi Nuclear Energy (GEH) to provide outage services to the plant.

Eurelectric Power Summit 2024
More info

Eurelectric Power Summit 2024

Under the terms of the contract, the extension, which runs until 2030, requires GEH to continue to provide a full portfolio of outage and inspection services for the 1275 MW BWR.

John Mackleer, Senior Vice President of Field Services for GEH, said: “We have supported KKL with outage and inspection services since it went into operation in 1984. We are proud to continue this strong working relationship.”